About Us
Description
The Department of Building Official (DBO) implements the National Building Code of the Philippines (P.D. 1096) and the Local Building Code of Quezon City (SP2518, S-2016) and their respective Implementing Rules and Regulations (IRR). DBO processes, evaluates, and issues Building Permits, its Ancillary Permits, Certificate of Occupancy, and Electricity Certificates (CFEI). The Building Official, through its Engineers, likewise conducts inspections within Quezon City to ensure compliance to safety building standards.
Mission
To render fast and efficient service in the evaluation of Building Permits, Certificates of Occupancy, and other Ancillary Permits without sacrificing safety, and to ensure compliance of building owners to safety standards through intensified safety inspections.
Vision
To effectively implement building safety standards, and to ensure that buildings and structures located within Quezon City are not only livable but are properly built and maintained.
Legal Bases
The provisions of the National Building Code of the Philippines (NBCP) (P.D.1096) and its Implementing Rules and Regulations (IRR), and the provisions of the Local Building Code of Quezon City (City Ordinance No. SP-2518, S-2016) and its Implementing Rules and Regulations (IRR) provides the Quezon City Building Official the authority to carry out their respective provisions within the territorial jurisdiction of Quezon City.
Executive Orders:
- EO No. 11, Series of 2017) Mandating Significant Reforms For Ease Of Doing Business In Quezon City
- (EO No. 11A, Series of 2017) Amending Section 4. Executive Order NR 11 (S.2017) In Relations To Its Coverage And ComplianceA
- (DO No. 39, Series of 2020) Revised Construction Safety Guidelines For The Implementation Of Infrastructure Projects During Covid-19 Public Health Crisis, Repealing Department Order No. Series Of 2020.
Service Pledge
Implement the provisions of the National Building Code of the Philippines, and the Local Building Code of Quezon City, its referral codes and other related laws and ordinances.
Evaluate, process and issue building permits, including ancillary and auxiliary permit applications, for all types of buildings and/or structures as required under the National Building Code of the Philippines, and the Local Building Code of Quezon City when the minimum requirements are satisfied.
Conduct ocular inspections on on-going and completed structures as a requirement in the processing and issuance of occupancy and other related final permits as well as conduct annual inspections of building and other structures to ensure compliance to safety standards to prevent unnecessary loss of life and property.
Evaluate, process and issue excavation permits for public utilities.
Plan, design and impose building regulatory measures and parameters needed to enhance the city development plans and programs.
Entertain complaints, conduct administrative summary proceedings, and issue stoppage Orders and Resolutions in the exercise of quasi-judicial functions.
Services
Issuance of Construction Permits
Construction permits are secured prior to the construction, alteration, repair, conversion, demolition, or addition of any building or structure or any portion thereof, within the territorial jurisdiction of Quezon City.
Issuance of Electrical or Wiring Permits with Certificates of Final Electrical Inspection
Electrical permits with certificate of electrical inspection are secured prior for electrical service connection, reconnection, and relocation or remodeling of existing electrical installation or for energization of temporary construction facility.
Issuance of Certificates of Final Electrical Inspection
A Certificate of Final Electrical Inspection is secured prior to energizing a new permanent electrical connection for a newly constructed building/structure.
Issuance of Stand-alone Mechanical Permits
Mechanical permits are secured prior to the installation of machineries or the legalization of installation, operation, and usage of machineries.
Issuance of Stand-alone Electronics Permits and/or Electronics 29 Certificate
Issuance of Stand-alone Electronics Permits and/or Electronics 29 Certificate
Electronics permits and certificates are secured prior to the installation of electronic equipment or the legalization of installation, operation, and usage of such equipment.
Issuance of Final Certificates
A certificate of occupancy or certificate of use shall be secured prior to the occupancy and/ or use of any building/structure, or any portion thereof.
Issuance of Construction Permits with Final Certificates 39 (for As-Built applications/ projects)
Construction permits with final certificates are secured for the legalization of existing structures (in the form of As-Built Plans).
Issuance of Certificates of Final Inspection (Mechanical 44 and Accelerograph)
A Certificate of Operation/Use is secured prior to the operation/use of the installed duly permitted machineries/accelerograph.
Issuance of Sign Permit
Sign permits are secured prior to the installation and usage of signage.
Issuance of Excavation Permit
Excavation permits are secured prior to the excavation for utility purposes.
Issuance of Certificates of Annual Inspection
Annual inspection certificates are issued after a request of ocular safety inspection and/ or after the regular inspection program of DBO as mandated by law.
Issuance of Green Building Preliminary Certificate
Green building preliminary certificates are secured to qualify for tax credit using a rating system. Structures covered by the Green Building Ordinance are also required to provide mandatory green building features as indicated.
Issuance of Green Building Final Certificate
Issuance of Certificates of Record
Administrative Summary Proceedings
Central Communications Unit
Programs
Inspection Of Air Conditioned & Non-Air-Conditioned Room/Spaces & Business Establishments, As Well As The Re-Opening Of All Cinemas In QC


CONSTRUCTION SAFETY GUIDELINES DURING COVID-19 PANDEMIC (DPWH D.O. 30, SERIES OF 2021)


CREATION OF EASE OF DOING BUSINESS (EODB) UNIT

Guides
How To Apply For A Construction Permit/Certificate
1. Online Application: To generate the Building Permit Application forms and the Checklist of Requirements, visit https://qceservices.quezoncity.gov.ph
A STEP BY STEP GUIDE
1.1. REGISTER / LOG IN
1.2. CLICK ON BUILDING PERMIT: ONE-STOP SHOP
1.3. CLICK THE BUILDING PERMIT APPLICATION ICON

1.4. ANSWER BASIC PROJECT INFORMATION

1.5. ADD / INVITE BUILDING PROFESSIONALS

1.6. GENERATE CHECKLIST OF REQUIREMENTS AND APPLICATION FORMS

1.7. SCHEDULE AN APPOINTMENT

1.8. PRINT THE APPOINTMENT SLIP

2. Set an appointment date for submission of documentary requirements via https://qceservices.quezoncity.gov.ph
3. Physically submit documentary requirements based on the checklist.
4. Pay and get permits. The Applicant may choose between physical payment and acquisition or online payment and courier service delivery.
5. Timeline is 5 working days
How To Register As A Building Professional
1. APPLY ONLINE
Please log in to our official website at https://qceservices.quezoncity.gov.ph/ click the Building Permit: One-Stop Shop, click the Building Professional Registration, provide basic information, and submit.
A STEP BY STEP GUIDE
1.1. REGISTER / LOG IN

1.2. CLICK ON BUILDING PERMIT: ONE-STOP SHOP

1.3. CLICK THE BUILDING PROFESSIONAL REGISTRATION ICON

1.4. PROVIDE PERSONAL INFORMATION

1.5. SUBMIT THE APPLICATION

How To Apply For A Wiring / Electrical Permit
1. APPLY ONLINE
Please log in to our official website at https://qceservices.quezoncity.gov.ph/, click the Building Permit: One-Stop Shop, and generate forms and a checklist.
SIGNUP >> LOGIN >> NEW TRANSACTION >> OTHER PERMITS >> Apply for Electricity >> Fill in YELLOW CARD details>> Fill in Questionnaire >>Generate checklist and print >> Click Apply >> Fill in Questionnaire >> Submit Application>> Print the forms.
For submission of your application, you may walk in at our Office (G/F Receiving Section, Civic Center Bldg. D, Q.C Hall Compound Quezon City)
A STEP-BY-STEP GUIDE
1.1. REGISTER / LOG IN
1.2. CLICK ON BUILDING PERMIT: ONE-STOP SHOP
1.3. CLICK THE OTHER PERMITS ICON
1.4. CLICK THE APPLY ELECTRICITY ICON
1.5. ANSWER BASIC INFORMATION
1.6. ADD / INVITE BUILDING PROFESSIONALS
1.7. GENERATE AND PRINT THE CHECKLIST AND APPLICATION FORMS
1.8. ELECTRONICALLY SUBMIT THE DOCUMENTS FOR PRE-EVALUATION
1.9. SCHEDULE AN APPOINTMENT
1.10. PRINT THE APPOINTMENT SLIP
2. Set an appointment date for submission of documentary requirements via https://qceservices.quezoncity.gov.ph
3. Physically submit documentary requirements based on the checklist.
4. Pay and get permits. The Applicant may choose between physical payment and acquisition or online payment and courier service delivery.
5. Timeline is 5 working days.
How To Apply For A Construction Permit/Certificate
1. APPLY ONLINE
For the application for a Permit, please log in to our official website at https://qceservices.quezoncity.gov.ph/, click the Building Permit: One-Stop Shop, provide basic information, and set an online appointment for submission. The requirements and forms are generated on the said website.
SIGNUP >>LOGIN >>NEW TRANSACTION >> Permit Type>> Apply (Submit Requirements)>> Fill in Questionnaire>> Generate Checklist and Print>> click APPLY >> Add/Invite professional >> Upload documents >> Submit application>> Save/print the forms>> SET APPOINTMENT.
A STEP-BY-STEP GUIDE
1.1. REGISTER / LOG IN
1.2. CLICK ON BUILDING PERMIT: ONE-STOP SHOP
1.3. CLICK THE BUILDING PERMIT APPLICATION ICON
1.4. ANSWER BASIC PROJECT INFORMATION
1.5. ADD / INVITE BUILDING PROFESSIONALS
1.5. GENERATE A CHECKLIST OF REQUIREMENTS AND APPLICATION FORMS
1.6. ELECTRONICALLY SUBMIT THE DOCUMENTS FOR PRE EVALUATION
1.7. SCHEDULE AN APPOINTMENT
1.8. PRINT THE APPOINTMENT SLIP
2. Set an appointment date for submission of documentary requirements via https://qceservices.quezoncity.gov.ph
3. Physically submit documentary requirements based on the checklist.
4. Pay and get permits. The Applicant may choose between physical payment and acquisition or online payment and courier service delivery.
5. Timeline is 5 working days
How Do I Know The Status Of Permit Application
You may verify your application status through our official website at https://qceservices.quezoncity.gov.ph/, click the Building Permit: One-Stop Shop, and use the Application Status Generator, or you may call us through 8988 4242 local 8905/8916.
How To Know / Submit My Compliance
The Department of Building Officials will notify you of your compliance through electronic mail or SMS.
To claim/comply with your deficiencies, please set an online appointment through our official website at https://qceservices.quezoncity.gov.ph/, click the Building Permit: One-Stop Shop. Please see the instructions below.
SIGNUP>> LOGIN>> NEW TRANSACTION>> PERMIT>> COMPLIANCE> INPUT APPLICATION NUMBER AND VERIFY>> SET APPOINTMENT.
How Do I Follow Up A Letter Request
You may call us at 8988 4242 local 8905/8916 or email us at [email protected].
How To File A Complaint
You may send us your concern through our official Email at [email protected] for proper assessment/documentation.
How To Request For A Certified True Copy Of Permit
You may send a request through our official Email at D[email protected] indicating the following information below.
Permit Date Issued:
Building Permit Number:
Registered Owner/ Application Name:
Application Address:
Authorization Letter (If Representative)
Attachment: (If any)
How To Apply/Request For A Certicate Of Annual Electrical Inspection(CAEI)
You may send a request through our official Email at d[email protected] indicating the following information below.
Building Name:
Establishment Name:
Location/Address:
Owner/Registered Name:
Contact Person:
Contact Number:
Attachment: (If any)
How To Submit A Verified Position Paper
You may send your verified position paper through our official Email at [email protected] indicating the following information as guidelines:
Reference/Case Number:
Complainant Name (Pangalan ng nagrereklamo)
Respondent Name (Pangalan ng nirereklamo)
Exact Address of Complaint (Tirahan ng nirereklamo)
Submit an essay relative to your complaints
Attach/submit evidence in support of your complaints
Or you may seek assistance from the Public Notary Office.
Department Directory
Department Head
Engr. Isagani R. Versoza Jr.
City Building Official
8988-4242 loc. 8912
[email protected]
Assistant Building Officials
Engr. Joselito C. Arcaina
Assistant Building Official for Enforcement
8988-4242 loc. 8905
[email protected]
Engr. Antonio A. Avila
Assistant Building Official for Administration
8988-4242 loc. 8905
[email protected]
Divisions/ Sections
Divisions | Officer Name | Office Address | Contact Information |
Administrative Division | Atty. Rainneheart M. Masorong Acting Chief Administrative Officer / Attorney IV | Ground Floor, Civic Center D (BRO Bldg.), Mayaman Street, Quezon City Hall Compound, Quezon City | 8988-4242 Local 8905, 8916 [email protected] |
Annual Building Inspection Division | Engr. Rodel A. Mesa Chief-ABID, Electrical Engineer V | 3rd Floor, Civic Center D (BRO Bldg.), Mayaman Street, Quezon City Hall Compound, Quezon City | 8988-4242 Local 8910 [email protected] |
Construction Permits Division | Engr. Jeriel Dan M. Niguidula Chief-CPD, Engineer V | 2nd Floor, Civic Center D (BRO Bldg.), Mayaman Street, Quezon City Hall Compound, Quezon City | 8988-4242 Local 8902 [email protected] |
Final Permits Division | Arch. Froilan Troy P. Tecson Chief-FPD, Architect V | 3rd Floor, Civic Center D (BRO Bldg.), Mayaman Street, Quezon City Hall Compound, Quezon City | 8988-4242 Local 8903 [email protected] |
Investigation and Adjudication Division | Atty. Freddie V. Lilagan Chief-IAD, Attorney V | 3rd Floor, Civic Center D (BRO Bldg.), Mayaman Street, Quezon City Hall Compound, Quezon City | 8988-4242 Local 8904 [email protected] |
Permit Processing for Simple Application Division | Engr. Kennedy P. Diokno Chief-PPSAD, Engineer V | 2nd Floor, Civic Center D (BRO Bldg.), Mayaman Street, Quezon City Hall Compound, Quezon City | 8988-4242 Local 1401 [email protected] |
Sign Board and Utilities Division | Engr. Ella G. Reyes Chief-SUD, Engineer V | 3rd Floor, Civic Center D (BRO Bldg.), Mayaman Street, Quezon City Hall Compound, Quezon City | 8988-4242 Local 8911 [email protected] |
Policy, Programming, and System Administration Division | Engr. Roy Xavier A. Cornista Chief-PPSyD, Engineer IV | 3rd Floor, Civic Center D (BRO Bldg.), Mayaman Street, Quezon City Hall Compound, Quezon City | 8988-4242 Local 8909 [email protected] |
Spotlight
The QC Department of the Building Official is SAFETY SEAL CERTIFIED

QC-BLDG PERMIT: ONE STOP SHOP on Viber


Post-Earthquake Assessment







To celebrate Civil Engineering Month, the Philippine Institute of Civil Engineers-QC formally turnovers two of their community projects; the Handbook on Minimum Structural Standards for a Single-Detached House and the Bagong Silangan Flood Management Study.


QC Build Easy 2nd Anniversary: “Roadmap to Innovations

e-Services link
https://qceservices.quezoncity.gov.ph
e-LINKS of the National Building Code of the Philippines
National Building Code of the Philippines
Implementing Rules and Regulations of the National Building Code of the Philippines (PD1096)
(Alternate: PD No. 1096 – 2004 Revised implementing rules and regulations (IRR) – PRBoA Unofficial Version (with 2008 Annotations) | Download the PD-1096 IRR (PDF))
Bureau of Fire Revised Quezon City Comprehensive Zoning Ordinance (Series of 2016)
THE LOCAL BUILDING CODE OF QUEZON CITY
Implementing Rules and Regulations
Local Building Code of Quezon City Ordinance No. SP-2518, S-2016
Highlights of the Local Building Code